Production Testing & Well Clean Up

vertical test separator9

Objective: Test wells to determine its flow capacity at specific conditions of reservoir and flowing pressures. Flow potential, annular pressure, critical flow rate, net gas production and water/oil ratio. We can offer mini well test separator for spot check of existing wells or larger package for well clean up after drilling campaign (Rigless).

Production Solutions offer Clean-up packages which includes surface production equipment and pre-production, high rate gas flow rate measurement, water handling and treatment & solids handling systems.

Well Testing is used to determine the flow capacity at specific conditions of reservoir and flowing pressures. Flow potential, annular pressure, critical flow rate, net gas production and water/oil ratio are determined.

Equipment Available:

  • Separators
  • Flare Booms
  • Choke Manifolds
  • Data Acquisition System
  • Pipework
  • Laboratory Equipment
  • Flare Stacks
  • ESD Systems
  • Gas Buster Tanks
  • Surge Tanks

Production Solutions ensure:

  • Reliability
  • Data quality to attain test objectives
  • Flexibility for varying reservoir characteristics
  • Well Test Design Review as per API RP 14 C (Surface Safety Systems)
  • Emergency Shut Down (ESD) system design
  • Monitoring Well Parameters – e.g. P, T, Q, H2S etc.
  • ESD Production Shut Down Valves, ESD Buttons, Lo/Hi Pilots
  • Pressure Safety Relieve Valves Protect lines with Working Pressure < Shut In Pressure

Main Menu